Adjustable handle to suit varying installation depths.
Inter changeable plunger & foot valves; easy to extract without removing riser pipes.
Two options for pedestal design are available:
a) Pedestal for concrete stand
b) Pedestal of India Mark II design with either3 legs mounting or flange mounting arrangement.
U-Seal, bobbins and 'O' ringsare of nitrile rubber and plunger rod of stainless steel.
10 mm dia x 3 Meters long mild steel hot dip galvanized rod with forged eye and hook connectors welded at both ends. This provides easy rod connections without use of any tool.
Each rod is provided with a rubber centralizer to replace at village level.
uPVC pipe 63 mm OD x 4.7 mm wall x 3 Meters long with socket-spigot cemented joint.
Each pipe is provided with a rubber centraliser to avoid contact with casting pipe.
APPLICATION DATA
Min. bore size
Internal dia of Cylinder
Stroke lenght
Average discharge per stroke
Operating depth
- 100 mm
- 50 mm
- 225 mm
- 0.44 Ltr.
- upto 45 Mtr. (approx)